Last week the supplemental electrical panel necessitated by living in “this Old House” was installed.  The existing panel did not have room for the solar panels to be connected.

Today, the DC Building inspector came, inspected, and gave approval (conditional on contractor sending photos of the roof).  Last step is to get PEPCO to come and change the meter.  That could take a couple of weeks.  Meanwhile, there is no rain in the 15-day forecast.  Best start doing the rain dances.